Assets

Every pump, unit and vehicle, with everything that ever happened to it

An asset record that accumulates. Repairs, costs, PM history and warranty in one place, because they were recorded as the work happened rather than typed up later.

See it with your own work  →
AC-1140 Compressor $2,140 Contactor $310 PM · Filters — PM · Coils —
01

History that builds itself

Every work order against a piece of equipment attaches to it. The record fills in as a by-product of doing the work.

02

A QR code on the machine

Print a label, stick it on the unit. A technician scans it and is on that asset's record, with its history and its open jobs, without typing an asset number into anything.

03

Repair or replace, answered with numbers

What this unit has cost over three years, and how often it went down, is a report rather than an argument.

04

Warranty before you pay for it

Warranty dates sit on the record, so the question gets asked before the invoice is approved rather than after.

In practice

The chiller goes down for the fourth time in eighteen months. You open the asset and there are the four jobs, what each cost, which contractor came out and what they replaced. That is the capital request written for you.

Next Parts and inventory Stock levels and parts requests, tied to the work that consumed them.

See it with your own equipment list

About twenty minutes, using your buildings and your work — not a canned example.

Request a Demo  →